Transmission/distribution cables
  • · Supply full-range cables for construction of refinery plants
  • · Stable supply of mid/low-voltage power cables for super-large power plants

 

Supply full-range cables for construction of refinery plants

Project Kuwait KIPIC / Al Zour Refinery Plant Customer FDH JV(Fluor/Daewoo E&C/Hyundai Heavy Industries) Objective To supply 132kV extra-high-voltage and low/mid-voltage , control and instrumentation cables to new large refinery plants Products delivered
  • · 132kV cables
  • · Low-voltage power cables, control and instrumentation cables, optical cables, fieldbus cables
Schedule 2017~2018 Implication
  • · Supply of all kinds of cables required for construction of new refinery plants based on its competency as a global total cable company
  • · Laying down the foundation for building a mid-to long term cooperative relationship with US-based Fluor, a global top EPC, through perfect delivery management and technical support
 

Stable supply of mid/low-voltage power cables for super-large power plants

Project Saudi Qurayyah IPP / Yanbu- II IPP CustomerSamsung E&T / Hanwha E&C Objective To supply low and med-voltage power cables and control cables for construction of super-large thermoelectric power plants Products delivered
  • · Mid/low-voltage power cables
  • · Control and instrumentation cables
Schedule 2013 Implication Winning customers’ trust by successfully carrying out the project through excellent quality and stable delivery management